| Below are some of
the projects we handed over to our clients in between
2000 & 2005:- |
 |
 |
| Project: |
Outdoor
Education Centre |
| Type: |
Alterations
/ Refurbishment / New Build |
| Client: |
Conwy
County Council |
| Architect: |
Conwy
County Council |
| Value: |
£275,000 |
| Summary: |
Extension
to the existing Outdoor Education Centre
in Cerrigydrudion. |
|
|
|
 |
 |
| Project: |
Penmaenmawr |
| Type: |
Alterations
/ Refurbishments |
| Client: |
Conwy
Grants Agency |
| Architect: |
John
Shearer |
| Value: |
£1,200,000 |
| Summary: |
The
work comprises of the refurbishment
of the external fabric of properties
which are privately owned. |
|
|
|
 |
 |
| Project: |
Amber
Cross |
| Type: |
Alterations
/ Refurbishments |
| Client: |
University
College of Chester |
| Architect: |
Design
Group Chester |
| Value: |
£90,000 |
| Summary: |
The
construction of Disabled Access ramp
together with landscape works etc, within
the Amber Cross area of the University
Campus |
|
|
|
 |
 |
| Project: |
Kings
School - Phase II |
| Type: |
Design
& Build |
| Client: |
Kings
School Chester |
| Architect: |
BSP
Chester |
| Value: |
£500,000 |
| Summary: |
New
Build steel framed building, kingspan
composite roofing panels with forticrete
blockwork internally and facing brick
and hardwood panelling externally |
|
|
|
 |
 |
| Project: |
Kings
School - Phase I |
| Type: |
Alterations
/ Refurbishments / Design & Build |
| Client: |
Kings
School Chester |
| Architect: |
BSP
Chester |
| Value: |
£1,500,000 |
| Summary: |
Construction
of extensions to classrooms, staff rooms
and technology rooms including refurbishment
of existing etc |
|
|
|
 |
 |
| Project: |
Llay
Resource Centre |
| Type: |
New
Build |
| Client: |
Wrexham
Council |
| Architect: |
N.
Bateman |
| Value: |
£1,100,000 |
| Summary: |
The
work comprises the erection of a single
storey information and resources centre. |
|
|
 |
 |
 |
| Project: |
Single
Aisle Phase II |
| Type: |
New
Factory |
| Client: |
Airbus
UK |
| Architect: |
Haltec |
| Value: |
£500,000 |
| Summary: |
Fitting
out of 2nd floor steelwork shell in
existing hanger (occupied) in to office,
toilets etc. |
|
|
|
 |
 |
| Project: |
Single
Aisle Phase I |
| Type: |
New
Factory |
| Client: |
Airbus
UK |
| Architect: |
Haltec |
| Value: |
£900,000 |
| Summary: |
Construction
of steel framed unit within hanger and
fitting out in to mess rooms, toilets,
offices and stores. Hanger in Full time
operation |
|
|
 |
 |
 |
| Project: |
Barkers
Lane C.P. School |
| Type: |
Alterations
/ Refurbishments / New Build |
| Client: |
Wrexham
Council |
| Architect: |
Brian
Leach |
| Value: |
£600,000 |
| Summary: |
The
work includes the erection of four extensions
to the existing school and alterations
and refurbishment of the existing area
internally. |
|
|
 |
 |
 |
| Project: |
New
Firestation |
| Type: |
Specialist |
| Client: |
Airbus
UK |
| Architect: |
Weightman
& Bullen |
| Value: |
£1,500,000 |
| Summary: |
Construction
of concrete piles with steel frame building
reinforced concrete floor with composite
steel roof and side panels with brick
and block up to 2.5 metres. |
|
|
|
 |
 |
| Project: |
Ysgol
Penrhyn |
| Type: |
New
Build / Alterations |
| Client: |
Wrexham
Council |
| Architect: |
Brian
Leach |
| Value: |
£900,000 |
| Summary: |
Construction
of 2.no large extensions including basements
and overall refurbishment of existing
school. |
|
|
|
 |
 |
| Project: |
Chester
Scout Hut |
| Type: |
New
Build |
| Client: |
Chester
City Council |
| Architect: |
Tweed
Nutall |
| Value: |
£250,000 |
| Summary: |
Jimsul
Construction Ltd won a coverted Civc
Award for the Construction of this landmark
building. |
|
|
| |
| |